The much anticipated construction of the Campeau Drive extension has begun. The construction involves extending the road and building a bridge over the Carp River. The extension will connect Campeau Drive from Didsbury Road to Country Glen Drive and is expected to be completed by October 2021.
The bridge will have four travel lanes with a 5m median. Each side will have sidewalks and bike lanes with barrier curbs between bike and vehicle lanes. Solid white lanes and bike symbols will be used to delineate sidewalks and bike lanes.